


- Cooling saved on empty nights
- 30–45%Cooling saved on empty nights
- Physical keys to hand over
- 0Physical keys to hand over
- Dashboard for every unit
- 1Dashboard for every unit
The brief
A short-let unit spends a meaningful share of the year empty, and in Dubai an empty unit still runs its air conditioning unless something stops it. That is the single largest recoverable cost in the sector.
We tie climate to the booking calendar, not to a guess. The unit sets back when it is empty, pre-cools before check-in, and reports if a guest leaves a terrace door open with the AC running.


Scope
What's included.
Specified as one scope with one point of accountability, or broken out if another contractor already holds part of it.
Booking-linked climate
Setback between stays and pre-cool before arrival, driven by the booking calendar rather than a fixed schedule.
Self-expiring guest access
A code issued per booking that stops working at checkout. No key handover, no lockbox, no changed locks.
Multi-unit dashboard
Every unit's temperature, occupancy, and door state on one screen, with alerts on exception.
Noise & occupancy monitoring
Decibel-threshold alerting without recording audio, so party-risk is caught early and privately.
Housekeeping workflow
Staff credentials scoped to cleaning windows, with entry logged per unit.
Guest-simple controls
One panel, obvious scenes, no app download required for a three-night stay.

Process
How the project runs.
The same engineers carry the project from consultation to handover. Nothing is subcontracted at the point where it matters.
- 01
Consultation
We walk the property or the drawings with you, establish how the space is actually used, and agree what the system must do before any product is named.
- 02
Design & specification
You receive a room-by-room schedule, a single-line diagram, and a fixed-price proposal. No allowances, no provisional sums.
- 03
First fix
Our engineers coordinate directly with the electrical and joinery contractors so containment, back boxes, and cable routes are right before plaster.
- 04
Commissioning
Every circuit is tested, every scene tuned on site against the real lighting, and the system is left documented rather than merely working.
- 05
Handover & care
A walkthrough with whoever lives there, a printed scene reference, and an ongoing support agreement with remote diagnostics.
Let's design your system.
Book a consultation with our certified engineers, or visit the experience centre to see the ecosystem running end to end.
Or call +971 50 455 5040 / +971 52 878 5858, Sat–Thu, 9:30–18:30 GST